DataOne
Tracked AI data center portfolio for DataOne: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 300 MW
Projects
- Nebius / DataOne Vineland AI Campus, 300 MW, Vineland, NJ, United States · under construction
Frequently asked questions
- How many data centers does DataOne have?
- Data Center Index tracks 1 data center campus with DataOne named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does DataOne have?
- 300 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 DataOne campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does DataOne build data centers?
- Tracked DataOne campuses sit in 1 market: NJ (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest DataOne data center?
- Nebius / DataOne Vineland AI Campus in NJ is the largest tracked DataOne campus at 300 MW, currently under construction. The developer or the press states that capacity, in a source dated March 5, 2025.