Cologix

North American network-neutral interconnection and hyperscale edge data center operator, majority-owned by Stonepeak since 2017.

Projects

Frequently asked questions

How many data centers does Cologix have?
Data Center Index tracks 3 data center campuses with Cologix named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Cologix have?
920 MW across 3 tracked campuses, counting operating and pipeline sites together. Of the 2 Cologix campuses with a capacity figure, 0 are filed, 2 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Cologix build data centers?
Tracked Cologix campuses sit in 2 markets: OH (2), VA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Cologix data center?
Cologix Johnstown AI Campus in OH is the largest tracked Cologix campus at 800 MW, currently announced. The developer or the press states that capacity, in a source dated November 20, 2024.