STT GDC Palava Campus
400 MW AI data center in Palava, India: under construction.
- Capacity: 400 MW
- Location: Palava, India
- Developer: STT GDC India
- Status: under construction
STT GDC Palava Campus is a 400 MW AI data center project located in Palava, India, currently under construction. It is being built by STT GDC India. This project is one of thousands of data-center facilities tracked by Data Center Index across India, covering operational, under-construction, announced, and permitted sites.
Project description
W.Media, March 18 2026: STT GDC India broke ground on its first data center at the new Palava campus in the Mumbai Metropolitan Region, 50 MW initial IT load on 46 acres; campus designed to scale to about 400 MW of IT load; backed by an INR 5,000 crore MoU with Maharashtra.
Related data center projects
- STT GDC Chennai Ambattur Campus, 130 MW, Chennai, India · operational
- STT GDC Chennai Siruseri Campus, 45 MW, Chennai, India · operational
- Adani & Google Visakhapatnam AI Campus, 1 GW, Visakhapatnam, India · under construction
- HyperVault Bharat Future City AI Campus, 1 GW, Hyderabad, India · announced
- Digital Connexion Visakhapatnam AI Campus, 1 GW, Visakhapatnam, India · announced
- Microsoft India AI Infrastructure (Hyderabad / Pune), 600 MW, India · operational
- CtrlS Chandanvelly Datacenter Park, 600 MW, Chandanvelly, India · announced
- Amazon Web Services AP-SOUTH-1 Mumbai Region, 400 MW, India · operational
Frequently asked questions
- What is STT GDC Palava Campus?
- STT GDC Palava Campus is an AI data center project in Palava, India tracked by Data Center Index. Its status is under construction.
- Where is STT GDC Palava Campus?
- STT GDC Palava Campus is in Palava, India.
- How big is STT GDC Palava Campus?
- Data Center Index tracks STT GDC Palava Campus at 400 MW. The developer or the press states that capacity, in a source dated March 18, 2026.
- Who is building STT GDC Palava Campus?
- STT GDC India is developing STT GDC Palava Campus.
Sources
- STT GDC India breaks ground for data center campus in Palava (w.media · press · 2026-03-18)