NeutraDC Nxera Batam Data Center (Kabil)
54 MW AI data center in Batam, Indonesia: under construction.
- Capacity: 54 MW
- Location: Batam, Indonesia
- Developer: NeutraDC (Telkom Indonesia) and Nxera (Singtel)
- Status: under construction
NeutraDC Nxera Batam Data Center (Kabil) is a 54 MW AI data center project located in Batam, Indonesia, currently under construction. It is being built by NeutraDC (Telkom Indonesia) and Nxera (Singtel). This project is one of thousands of data-center facilities tracked by Data Center Index across Indonesia, covering operational, under-construction, announced, and permitted sites.
Project description
Telkom's NeutraDC topped off BTM-1 at the Kabil Industrial Estate in Batam on 30 October 2025, with 18 MW of initial IT load scalable to 54 MW, developed with Nxera (Singtel) and Medco. Kontan reported first-phase operation targeted for the first half of 2026.
Related data center projects
- BDx AI Campus 2 (CGK4) Jatiluhur, 640 MW, Jatiluhur, Purwakarta, Indonesia · under construction
- Digital Edge CGK AI Mega Campus, 500 MW, Bekasi Regency, Indonesia · under construction
- AWS Indonesia Cloud Region (Jakarta), 250 MW, Jakarta, Indonesia · operational
- Princeton Digital Group JC4 Campus, 240 MW, Bekasi Regency, Indonesia · under construction
- EdgeConneX Jakarta Campus (Cikarang), 200 MW, Cikarang, Indonesia · operational
- EDGNEX Jakarta AI Data Center, 144 MW, Jakarta, Indonesia · under construction
- Princeton Digital Group JC3 Campus, 120 MW, Bekasi Regency, Indonesia · under construction
- Google Cloud Indonesia (Jakarta), 100 MW, Jakarta, Indonesia · operational
Frequently asked questions
- What is NeutraDC Nxera Batam Data Center (Kabil)?
- NeutraDC Nxera Batam Data Center (Kabil) is an AI data center project in Batam, Indonesia tracked by Data Center Index. Its status is under construction.
- Where is NeutraDC Nxera Batam Data Center (Kabil)?
- NeutraDC Nxera Batam Data Center (Kabil) is in Batam, Indonesia.
- How big is NeutraDC Nxera Batam Data Center (Kabil)?
- Data Center Index tracks NeutraDC Nxera Batam Data Center (Kabil) at 54 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building NeutraDC Nxera Batam Data Center (Kabil)?
- NeutraDC (Telkom Indonesia) and Nxera (Singtel) is developing NeutraDC Nxera Batam Data Center (Kabil).
Sources
- TelkomGroup tops off NeutraDC Nxera Batam hyperscale data center to power the AI ecosystem (neutradc.com · press · 2025-11-06)
- Kontan (industri.kontan.co.id · press · 2025-11-06)