Yondr Group
Tracked AI data center portfolio for Yondr Group: campuses, partners and project map.
- Projects tracked: 3
- Total pipeline: 649 MW
Projects
- Yondr Dallas Campus (Lancaster), 550 MW, Lancaster, TX, United States · announced
- Yondr Manassas Data Center Campus, 72 MW, Manassas, VA, United States · announced
- Yondr Toronto AI Data Center, 27 MW, Toronto, Canada · operational
Frequently asked questions
- How many data centers does Yondr Group have?
- Data Center Index tracks 3 data center campuses with Yondr Group named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Yondr Group have?
- 649 MW across 3 tracked campuses, counting operating and pipeline sites together. Of the 3 Yondr Group campuses with a capacity figure, 0 are filed, 3 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Yondr Group build data centers?
- Tracked Yondr Group campuses sit in 3 markets: Canada (1), TX (1), VA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Yondr Group data center?
- Yondr Dallas Campus (Lancaster) in TX is the largest tracked Yondr Group campus at 550 MW, currently announced. The developer or the press states that capacity, in a source dated August 19, 2025.