Yondr
Tracked AI data center portfolio for Yondr: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 336 MW
Projects
- Yondr Northern Virginia Campus (Loudoun), 336 MW, Aldie, VA, United States · operational
Frequently asked questions
- How many data centers does Yondr have?
- Data Center Index tracks 1 data center campus with Yondr named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Yondr have?
- 336 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Yondr campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Yondr build data centers?
- Tracked Yondr campuses sit in 1 market: VA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Yondr data center?
- Yondr Northern Virginia Campus (Loudoun) in Aldie, VA is the largest tracked Yondr campus at 336 MW, currently operational. The developer or the press states that capacity, in a source dated November 18, 2024.