Sberbank (Sber)

Tracked AI data center portfolio for Sberbank (Sber): live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does Sberbank (Sber) have?
Data Center Index tracks 1 data center campus with Sberbank (Sber) named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Sberbank (Sber) have?
82 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Sberbank (Sber) campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Sberbank (Sber) build data centers?
Tracked Sberbank (Sber) campuses sit in 1 market: Russia (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Sberbank (Sber) data center?
Sberbank Balakovo AI Data Center in Russia is the largest tracked Sberbank (Sber) campus at 82 MW, currently under construction. The developer or the press states that capacity, in a source dated September 20, 2026.