Prometheus Hyperscale

Developer of liquid-cooled hyperscale data centers, formerly Wyoming Hyperscale (renamed in 2024), led by founder Trenton Thornock; flagship campus is in Evanston, Wyoming, with an Oklo nuclear power partnership.

Projects

Frequently asked questions

How many data centers does Prometheus Hyperscale have?
Data Center Index tracks 2 data center campuses with Prometheus Hyperscale named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Prometheus Hyperscale have?
2.5 GW across 2 tracked campuses, counting operating and pipeline sites together. Of the 2 Prometheus Hyperscale campuses with a capacity figure, 0 are filed, 2 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Prometheus Hyperscale build data centers?
Tracked Prometheus Hyperscale campuses sit in 1 market: WY (2). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Prometheus Hyperscale data center?
Prometheus Hyperscale Evanston Campus in Uinta County, WY is the largest tracked Prometheus Hyperscale campus at 1.3 GW, currently permitted. The developer or the press states that capacity, in a source dated June 22, 2026.

Profile sources