Princeton Digital Group
Tracked AI data center portfolio for Princeton Digital Group: live capex history, supplier exposure, and project map.
- Projects tracked: 3
- Total pipeline: 480 MW
Projects
- Princeton Digital Group JC4 Campus, 240 MW, Bekasi Regency, Indonesia · under construction
- Princeton Digital Group MU2 Campus, 120 MW, Mumbai, India · under construction
- Princeton Digital Group JC3 Campus, 120 MW, Bekasi Regency, Indonesia · under construction
Frequently asked questions
- How many data centers does Princeton Digital Group have?
- Data Center Index tracks 3 data center campuses with Princeton Digital Group named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Princeton Digital Group have?
- 480 MW across 3 tracked campuses, counting operating and pipeline sites together. Of the 3 Princeton Digital Group campuses with a capacity figure, 0 are filed, 3 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Princeton Digital Group build data centers?
- Tracked Princeton Digital Group campuses sit in 2 markets: Indonesia (2), India (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Princeton Digital Group data center?
- Princeton Digital Group JC4 Campus in Bekasi Regency, Indonesia is the largest tracked Princeton Digital Group campus at 240 MW, currently under construction. The developer or the press states that capacity, in a source dated April 30, 2026.