- Projects tracked: 1
- Total pipeline: 120 MW
Projects
- Polarise Amberg AI Data Center, 120 MW, Amberg, Germany · announced
Frequently asked questions
- How many data centers does Polarise have?
- Data Center Index tracks 1 data center campus with Polarise named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Polarise have?
- 120 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Polarise campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Polarise build data centers?
- Tracked Polarise campuses sit in 1 market: Germany (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Polarise data center?
- Polarise Amberg AI Data Center in Germany is the largest tracked Polarise campus at 120 MW, currently announced. The developer or the press states that capacity, in a source dated March 10, 2026.