Next Frontier (Coatue)
Tracked AI data center portfolio for Next Frontier (Coatue): campuses, partners and project map.
- Projects tracked: 1
- Total pipeline: 430 MW
Projects
- Next Frontier New Lebanon Campus (Fluidstack), 430 MW, New Lebanon, IN, United States · announced
Frequently asked questions
- How many data centers does Next Frontier (Coatue) have?
- Data Center Index tracks 1 data center campus with Next Frontier (Coatue) named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Next Frontier (Coatue) have?
- 430 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Next Frontier (Coatue) campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Next Frontier (Coatue) build data centers?
- Tracked Next Frontier (Coatue) campuses sit in 1 market: IN (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Next Frontier (Coatue) data center?
- Next Frontier New Lebanon Campus (Fluidstack) in IN is the largest tracked Next Frontier (Coatue) campus at 430 MW, currently announced. The developer or the press states that capacity, in a source dated May 14, 2026.