MTN Group
Tracked AI data center portfolio for MTN Group: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 9 MW
Projects
- MTN AI Data Center (Nigeria), 9 MW, Ikeja, Nigeria · operational
Frequently asked questions
- How many data centers does MTN Group have?
- Data Center Index tracks 1 data center campus with MTN Group named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does MTN Group have?
- 9 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 MTN Group campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does MTN Group build data centers?
- Tracked MTN Group campuses sit in 1 market: Nigeria (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest MTN Group data center?
- MTN AI Data Center (Nigeria) in Ikeja, Nigeria is the largest tracked MTN Group campus at 9 MW, currently operational. The developer or the press states that capacity, in a source dated July 1, 2025.