Hyperco

Tracked AI data center portfolio for Hyperco: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does Hyperco have?
Data Center Index tracks 1 data center campus with Hyperco named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Hyperco have?
150 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Hyperco campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Hyperco build data centers?
Tracked Hyperco campuses sit in 1 market: Finland (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Hyperco data center?
Hyperco Koria Data Center Campus in Kouvola, Finland is the largest tracked Hyperco campus at 150 MW, currently under construction. The developer or the press states that capacity, in a source dated September 8, 2026.