Google / AdaniConneX / Nxtra by Airtel
Tracked AI data center portfolio for Google / AdaniConneX / Nxtra by Airtel: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 1 GW
Projects
- Adani & Google Visakhapatnam AI Campus, 1 GW, Visakhapatnam, India · under construction
Frequently asked questions
- How many data centers does Google / AdaniConneX / Nxtra by Airtel have?
- Data Center Index tracks 1 data center campus with Google / AdaniConneX / Nxtra by Airtel named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Google / AdaniConneX / Nxtra by Airtel have?
- 1 GW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Google / AdaniConneX / Nxtra by Airtel campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Google / AdaniConneX / Nxtra by Airtel build data centers?
- Tracked Google / AdaniConneX / Nxtra by Airtel campuses sit in 1 market: India (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Google / AdaniConneX / Nxtra by Airtel data center?
- Adani & Google Visakhapatnam AI Campus in India is the largest tracked Google / AdaniConneX / Nxtra by Airtel campus at 1 GW, currently under construction. The developer or the press states that capacity, in a source dated April 28, 2026.