ePLDT / VITRO Inc.

Tracked AI data center portfolio for ePLDT / VITRO Inc.: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does ePLDT / VITRO Inc. have?
Data Center Index tracks 1 data center campus with ePLDT / VITRO Inc. named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does ePLDT / VITRO Inc. have?
100 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 ePLDT / VITRO Inc. campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does ePLDT / VITRO Inc. build data centers?
Tracked ePLDT / VITRO Inc. campuses sit in 1 market: Philippines (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest ePLDT / VITRO Inc. data center?
ePLDT VITRO General Trias AI Campus in Philippines is the largest tracked ePLDT / VITRO Inc. campus at 100 MW, currently announced. The developer or the press states that capacity, in a source dated September 30, 2025.