EcoDataCenter

Tracked AI data center portfolio for EcoDataCenter: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does EcoDataCenter have?
Data Center Index tracks 1 data center campus with EcoDataCenter named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does EcoDataCenter have?
250 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 EcoDataCenter campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does EcoDataCenter build data centers?
Tracked EcoDataCenter campuses sit in 1 market: Sweden (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest EcoDataCenter data center?
EcoDataCenter Borlänge AI Mega Campus in Sweden is the largest tracked EcoDataCenter campus at 250 MW, currently under construction. The developer or the press states that capacity, in a source dated September 12, 2026.