CoreWeave / AMD
Tracked AI data center portfolio for CoreWeave / AMD: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 1 GW
Projects
- Core Scientific Muskogee, 1 GW, Muskogee, OK, United States · operational
Frequently asked questions
- How many data centers does CoreWeave / AMD have?
- Data Center Index tracks 1 data center campus with CoreWeave / AMD named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does CoreWeave / AMD have?
- 1 GW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 CoreWeave / AMD campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does CoreWeave / AMD build data centers?
- Tracked CoreWeave / AMD campuses sit in 1 market: OK (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest CoreWeave / AMD data center?
- Core Scientific Muskogee in OK is the largest tracked CoreWeave / AMD campus at 1 GW, currently operational. The developer or the press states that capacity, in a source dated August 14, 2026.