Big Watt Digital
Tracked AI data center portfolio for Big Watt Digital: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 30 MW
Projects
- Big Watt Digital Sully County, 30 MW, Onida, SD, United States · operational
Frequently asked questions
- How many data centers does Big Watt Digital have?
- Data Center Index tracks 1 data center campus with Big Watt Digital named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Big Watt Digital have?
- 30 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Big Watt Digital campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Big Watt Digital build data centers?
- Tracked Big Watt Digital campuses sit in 1 market: SD (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Big Watt Digital data center?
- Big Watt Digital Sully County in Onida, SD is the largest tracked Big Watt Digital campus at 30 MW, currently operational. The developer or the press states that capacity, in a source dated January 30, 2026.