Accelerated Infrastructure Capital (AIC) & Kinh Bac City (KBC)
Tracked AI data center portfolio for Accelerated Infrastructure Capital (AIC) & Kinh Bac City (KBC): live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 200 MW
Projects
- SGI-HCM AI Data Center Campus, 200 MW, Ho Chi Minh City, Vietnam · under construction
Frequently asked questions
- How many data centers does Accelerated Infrastructure Capital (AIC) & Kinh Bac City (KBC) have?
- Data Center Index tracks 1 data center campus with Accelerated Infrastructure Capital (AIC) & Kinh Bac City (KBC) named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Accelerated Infrastructure Capital (AIC) & Kinh Bac City (KBC) have?
- 200 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Accelerated Infrastructure Capital (AIC) & Kinh Bac City (KBC) campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Accelerated Infrastructure Capital (AIC) & Kinh Bac City (KBC) build data centers?
- Tracked Accelerated Infrastructure Capital (AIC) & Kinh Bac City (KBC) campuses sit in 1 market: Vietnam (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Accelerated Infrastructure Capital (AIC) & Kinh Bac City (KBC) data center?
- SGI-HCM AI Data Center Campus in Ho Chi Minh City, Vietnam is the largest tracked Accelerated Infrastructure Capital (AIC) & Kinh Bac City (KBC) campus at 200 MW, currently under construction. The developer or the press states that capacity, in a source dated September 18, 2026.