1547 Critical Systems Realty
Tracked AI data center portfolio for 1547 Critical Systems Realty: campuses, partners and project map.
- Projects tracked: 8
- Total pipeline: 4 MW
Projects
- 1547 SBIN1 Union Station South Bend, 3 MW, South Bend, IN, United States · operational
- 1547 MIWI1 Wells Building Milwaukee, 1 MW, Milwaukee, WI, United States · operational
- 1547 CHWY1 Cheyenne, Cheyenne, WY, United States · operational
- 1547 DRFortress Honolulu, Honolulu, HI, United States · operational
- 1547 HAII1 AlohaNAP Kapolei, Kapolei, HI, United States · operational
- 1547 MCTX1 Chase Tower McAllen, McAllen, TX, United States · operational
- 1547 PTOR1 Pittock Block Portland, Portland, OR, United States · operational
- 1547 CHIL2 Chicago (725 South Wells), Chicago, IL, United States · operational
Frequently asked questions
- How many data centers does 1547 Critical Systems Realty have?
- Data Center Index tracks 8 data center campuses with 1547 Critical Systems Realty named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does 1547 Critical Systems Realty have?
- 4 MW across 8 tracked campuses, counting operating and pipeline sites together. Of the 2 1547 Critical Systems Realty campuses with a capacity figure, 0 are filed, 2 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does 1547 Critical Systems Realty build data centers?
- Tracked 1547 Critical Systems Realty campuses sit in 7 markets: HI (2), IL (1), IN (1), OR (1), TX (1), WI (1), WY (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest 1547 Critical Systems Realty data center?
- 1547 SBIN1 Union Station South Bend in IN is the largest tracked 1547 Critical Systems Realty campus at 3 MW, currently operational. The developer or the press states that capacity, in a source dated November 18, 2026.